End-to-end delivery of operational platforms — ERP, QMS, DMS, POS or custom systems — from requirement definition through rollout and stabilization. Vendor-neutral; you get the right system for your business, not the one I'm certified on.
Four system categories cover 90% of what growing businesses actually need. I help you pick the right one — or the right combination — and then deliver it.
SAP Business One, Microsoft Dynamics 365 Business Central, Oracle NetSuite, Zoho, Odoo and Tally Prime — sized for SME and mid-market.
MasterControl, ZenQMS, ComplianceQuest, Qualio and ISO-9001-anchored custom stacks — designed for audit-readiness from day one.
Veeva Vault, OpenText Documentum, MasterControl Documents, SharePoint-anchored DMS and custom 21 CFR Part 11-compliant document systems.
Multi-outlet POS + ERP integration for retail, F&B and bakery operators — central inventory, transfers, reconciliation and reporting.
When no off-the-shelf product fits — workflow-heavy, domain-specific systems built on modern web stacks with clean architecture.
Connectors, APIs, middleware and data pipelines to make the above systems actually talk to each other — often the hidden 40% of any implementation.
Structured requirement definition — functional, non-functional, data, compliance and integration — signed off by stakeholders before vendor conversations start.
RFP authoring, vendor shortlisting, honest demo facilitation, reference calls and final selection — vendor-neutral, optimized for your business.
Solution architecture, configuration, custom development where needed, integration build-out, and data migration design.
Test-script authoring, UAT cycles, cutover planning, go-live, and the critical first 30 days of production support.
8–12 weeks of close engagement post-go-live — fixing what real usage surfaces, optimizing workflows, tuning integrations, and transitioning to steady-state support.
Full documentation, knowledge transfer to your internal team or chosen support partner, and a post-implementation review with recommendations for phase 2.
DMS / QMS / eQMS rollouts with 21 CFR Part 11 and GxP compliance baked in. Veeva Vault, Documentum, MasterControl and their migrations.
SME ERP with shopfloor connectivity, production planning, OEE reporting and integration with existing MES / SCADA.
Multi-outlet POS + ERP integration, central inventory, transfers, reconciliation and consolidated reporting — including bakery / F&B operations.
Branch-operations workflow platforms, KYC systems, approval-workflow engines, and custom integrations with core-banking and LOS systems.
CAFM platform rollouts — Planon, Archibus, FMX, MicroMain and comparable systems — integrated with helpdesk and O&M reporting.
Custom systems for solar / wind commissioning, NCR workflows, balance-of-plant document control, and O&M data stacks.
Single platform rollout (one ERP module, one DMS, one POS network) — typically 3–6 months end-to-end.
Multi-module ERP, ERP + DMS + integration, or platform migration — 6–18 months, with stabilization and handover.
Let's discuss scope, vendor options and realistic timelines — straight talk, no commitment.